任务单 #44504

Link with road no longer work. It ceases at each step

开放日期: 2022-05-03 21:21 最后更新: 2022-05-06 09:30

报告人:
属主:
类型:
状态:
关闭
组件:
里程碑:
优先:
5 - Medium
严重性:
6
处理结果:
Fixed
文件:
2

Details

With on worker, SHIFT-R (or CTRL-R i don't remember) allows to draw a path, which should be paved with road.

But, after doing the first tile, i got a message like 'activity is not available' , so the jobs stops, instead of moving the worker to next tile and continue

任务单历史 (3/8 Histories)

2022-05-03 21:21 Updated by: alain_bkr
  • New Ticket "Link with road no longer work. It ceases at each step" created
2022-05-03 21:44 Updated by: cazfi
评论

Likely a regression caused by #44370. At least the failure is within the very code it rearranged.

2022-05-03 22:04 Updated by: cazfi
评论

Reply To cazfi

Likely a regression caused by #44370. At least the failure is within the very code it rearranged.

The activity was erroneously considered illegal already before #44370, but it made such activities considered illegal to also drop orders.

2022-05-03 22:30 Updated by: cazfi
  • 属主 Update from (无) to cazfi
  • 处理结果 Update from to Accepted
  • 组件 Update from (无) to Server
2022-05-04 07:07 Updated by: alain_bkr
评论

thanks , it fixed the problem on 3.0.1

2022-05-06 09:30 Updated by: cazfi
  • 状态 Update from 开启 to 关闭
  • 处理结果 Update from Accepted to Fixed

编辑

Please login to add comment to this ticket » 登录名