Download List

项目描述

Auto Project Planner automatically calculates a
proper project plan based on your effort
estimations and the due dates you have in mind. A
list of tasks and a list of employees can be
defined. Tasks can be assigned to one or more
employees. It is also possible to define a maximum
percentage value an employee can/should work on a
task. Public holidays, leaves, weekly working
hours, and more parameters can be specified and
are considered in the calculation. According to
this input, the software computes time plans by
minimizing the MSE (mean squared error) between
expected and computed end dates.

系统要求

System requirement is not defined
Information regarding Project Releases and Project Resources. Note that the information here is a quote from Freecode.com page, and the downloads themselves may not be hosted on OSDN.

2009-11-02 10:08
2.4.3

轻微错误修正已。该解决方案中的一些不必要的文件已被删除。
标签: Minor bugfixes
Minor bugfixes have been made. Some unnecessary files in the solution have been removed.

2009-10-21 19:10
2.4.2

主要错误修正已。
Major bugfixes have been made.

2009-05-23 03:32
2.4

有了这个版本,XML已经取代了旧的二进制文件格式,以及完整的代码重构了进展。
With this version, XML has replaced the old binary file format, and a complete code refactoring has been made.

2008-08-16 02:31
2.3

这是可能的任务和工作安排。拖放问题是固定和GUI已被重新设计。
标签: APP.NET, Minor feature enhancements
It is possible to arrange tasks and workers. The drag and drop problem is fixed and the GUI has been reworked.

2008-08-10 01:39
2.2

这是很容易让您的项目计划是最新的。信息所发生的事情在你的任务(从今天才开始)可以设置。在以前的版本,你总是要重新估计的任务,因为它就要从今天开始。此外,这个版本包含一个项目的第二短的时间计算方法。
标签: APP.NET, Major feature enhancements
It is much easier to keep your project plans up to date. Information about what happened in your task (from the beginning until today) can be set. In previous versions, you always had to redefine the task estimation as it would begin today. Additionally, this version contains a second calculation method for shorter time projects.

Project Resources